Client:

Fraser Coast Regional Council

Contract Value:

circa $2 million

Location:

Hervey Bay

Completion:

March, 2023

Scope of Works:

Reconstruction of approximately 380 metres of Road between Boat Harbour Drive and Torquay Road.  Urban environment interfacing with state controlled road with 8 intersections, signalised intersection, mobility corridor with high volumes of traffic. The works were split into two separable portions:

  • SP1 – Watermain Renewal
  • SP2 – Road Reconstruction

The Scope of works for SP1 included:

  • Removal of 460m of asbestos watermain
  • Watermain installation
  • Property service connections
  • Pressure Testing
  • Commissioning
  • Capping of abandoned watermain

The Scope of works for SP2 included:

  • Clearing and Grubbing
  • General Earthworks -cut to spoil
  • Remove and replace – rock mattress
  • Combi grid 30/30
  • Drainage structures (Pipeline & Pits)
  • Subbase pavement
  • Kerb & Channel
  • Base pavement
  • Vehicle crossovers/driveway/footpaths/kerb ramps
  • Road resurfacing (spray seal & asphalt)