Walker Street Pavement Renewal – Maryborough
A collaboration of the Fraser Coast Council and the Transport Infrastructure Development Scheme. Walker Street is a primary route into the CBD and out to the Bruce Hwy. -

Lennox Street – Stormwater Upgrade
Lennox Street stormwater upgrade night works, bounded by signalised intersection at either end and also included one of two main accesses to station square shopping centre. -

Queens Road, Scarness – Pavement Renewal
Reconstruction of approximately 380 metres of Road between Boat Harbour Drive and Torquay Road. -

Tinnanbar Road Rehabilitation & Construction
Realignment of identified sections through harvested plantation for safe vehicular movements as the only access road to the township. -

Golden Gate Bridge replacement
Located in Toolara Forest, the bridge suffered significant flood damage and was closed. -

Dundowran Road, Pavement Renewal
Dundowran Road, Dundowran Project extended to the intersection with Pialba-Burrum Heads Road (a state controlled road). -

Pioneers Rest Bridge Demolition
Demolish an existing timber bridge over a permanent water body with particular attention being made to flora and fauna management. -

Pilerwa Road – Road Reconstruction
Reconstruct and realign an approximately 500m section of Pilerwa Road. -

Guava Street Pavement Renewal – Maryborough
Reconstruction of approximately 420 metres of the road with pavement widening and installation of kerb and channel as well as drainage upgrades. -

Yerra Road, Mungar Stage 3 – Road Augmentation
Reconstruct a section of Yerra Road to improve road geometry, riding quality and safety. Implementation of drainage systems, kerb and channelling. -

Bideford/Colyton Street, Torquay – Intersection Improvement
Construction of a full intersection upgrade to a roundabout, including significant drainage works design. -

Torquay Road Reconstruction
Reconstruction of 740m of Torquay Road, between Queens road and Denman Camp Road.